Site preparation

Building a house begins with the preparation of the construction site:
 

- It makes an analysis of the soil (geotechnical studies). This type of item is very important, from it does push the whole architectural design, as based on the results of soil analysis calculated the foundation of the house, its structure (frame).

 - Surveying (topography) is a measurement site, determine its physical coordinates on the terrain, the shape and location of it all available objects (old buildings, trees, communications). Surveyor making technical documentation in the elevation values ​​as well as all the essential data to indicate the optimal location of future facilities.

- Excavation and earthworks. Land works in our time is completely mechanized and are made using high-tech machines. Preparatory ground works include: cleaning the territory of the excess amount of land, the removal of plants (agreed with the City Council), the development of the excavation under the basement fill the house, construction of drainage systems, digging trenches for utilities. The final stage of earthworks - a project approved in the relief area (the formation of the landscape). Produced dosypki land, imported black soil, carried out planting of trees and plants.